• artyom@piefed.social
      link
      fedilink
      English
      arrow-up
      2
      ·
      19 days ago

      According to my research, there is no such permit required in Utah. And presumably new legislation is looking to have this exception as well.

        • artyom@piefed.social
          link
          fedilink
          English
          arrow-up
          1
          ·
          edit-2
          19 days ago

          Your link doesn’t mention anything about “balcony solar”. And these systems are not supposed to export to the grid anyway.

          why “presumably”?

          Because the whole point is to make solar easier and more affordable?

          • acosmichippo@lemmy.world
            link
            fedilink
            English
            arrow-up
            10
            ·
            edit-2
            19 days ago

            Your link doesn’t mention anything about “balcony solar”.

            “Application process for rooftop solar and other smaller systems”. If you want to export power to the grid from anything at all, you must go through this process. If you wanted to export power from a hamster on a wheel you must apply for PTO.

            Because the whole point is to make solar easier and more affordable?

            of course, but not at the cost of safety and grid reliability.