Dedicated buslanes are great, but they can cause lumpy tarmac if you run a high frequency, high maintenance costs that could detract from other highway repairs…
Maybe add some long rows of steel reinforcement into the buslane (just to reduce maintenance costs of course), a protective barrier / embankment to stop cars encroaching.
Use E-busses of course, but maybe overhead wires, purely to reduce weight and fire risk.
/jk
I know in reality the curves and grades on a highway are too tight and steep, so you need a new easement.
Dedicated buslanes are great, but they can cause lumpy tarmac if you run a high frequency, high maintenance costs that could detract from other highway repairs…
Maybe add some long rows of steel reinforcement into the buslane (just to reduce maintenance costs of course), a protective barrier / embankment to stop cars encroaching.
Use E-busses of course, but maybe overhead wires, purely to reduce weight and fire risk.
/jk
I know in reality the curves and grades on a highway are too tight and steep, so you need a new easement.